• SWN BCH Bldg small converted

    BC Hydro Sub Station Control Buildings

    CANbuild Solutions was contracted to supply and install two pre-engineered metal buildings for BC Hydro's South Wellington and Buckley Bay Substations on Vancouver Island.  These post disaster buildings utilising insulated metal panels will stand the test of time.

  • North Island College Kitchen Exterior

    North Island College Kitchen

    The new Teaching Kitchen is now up and operational for the Port Alberni North Island College Campus.  The aim of this project was to provide a first-class, fully-equipped professional kitchen to allow the college to expand their culinary program, and to offer students with an on-campus training facility.  The kitchen provides 2,900sq.ft of workspace, with 18 student stations, pastry stations, cooking stations, and a separate dishwashing area.  Additionally there is a 24-seat dining room that will double as a classroom.

  • Environmental Construction

    The typical CANbuild steel building is manufactured from at least 70% recycled steel. To top that, at the end of its useful life, 100% of a steel-frame building can be recycled into a variety of steel products including new cars, appliances, buildings and bridges.

    Contact Us Today
  • Manufacturing & Industrial

    CANbuild offers complete flexibility of layout and workflow, allows for use of cranes and other heavy equipment as required in most manufacturing and industrial applications, while also allowing for fast, economical future building expansion if required.

    Contact Us Today
  • Recreation

    CANbuild custom-designed clear span systems from American Buildings meet all open playing and spectator space needs, along with locker, child-care, lounge, foodservice, and other related facility requirements to ensure a quality building that exceeds expectations and build's value well into the future of Vancouver Island's community's and family's experiences.

    Contact Us Today
  • HCCB

    City of Nanaimo Covered Sport Facility

    CANbuild Solutions were pleased to have been awarded the contract to supply and install a pre-engineered metal building for the City of Nanaimo Centennial Park on Vancouver Island. This 220' by 110' building will host lacrosse and other functions in cooperation with the John Barsby High School.

Design-Build Construction Uses a Unified Work Flow

What Is Design-Build?

Design-build consists of one entity, one contract, and one unified flow of work from initial concept through completion.

Learn More
We Work Hard To Earn Your Trust

Earning Your Trust

Responsibility, communication, innovation, efficiency, openness, honesty and above all respect for our client. Those are our values.

Learn More
Canbuild Smart Solutions Work With a Wide Range of Industries

Industries We Work With

We're not limited to working within a small number of industries. Auto dealerships, warehouses, and everything in between; we’re ready to help.

Learn More

CANbuild Smart Solutions

Contact us today to begin Phone: 888.406.6884 your commercial construction project: 888.406.6884

 


 

Add to Address BookClick to add CANbuild Smart Solutions
to your Address Book

 


Email Canbuild Smart Solutionsto start you commercial construction project today.